Pipe capacity can support pipe size: 12"
Adjustable height: 140 / 82cm
Maximum load weight: 2500 lbs
Inspection/Maintenance
Clean the stand to aid inspection and improve control. Inspect the stand before each use for proper assembly, wear, damage, modification or other issues that could affect safe use. Install any required parts, such as the hand screw. If any problems are found, do not use until corrected.
Lubricate all moving parts/joints as needed with light lubricating oil. Wipe up excess oi.
Set Up/Operation
1. Make sure all equipment is inspected and set up per its instructions
2. Locate a clear, level, stable location for the stand, other equipment and the operator
3. Make sure the legs are fully open and the feet sit squarely on the floor.
4. Height Adjustment:
Do not exceed stand rating. Stands are equipped with a lock ring: Securely grip head assembly. Loosen hand screw. Raise lock ring to disengage elevator tube. Move head assembly to desired height and lower lock ring to engage elevator tube. Do not raise the elevator tube past the hand screw. Make sure lock ring engages elevator tube and securely tighten the hand screw.
Models equipped with jack screw for fine adjustment: Hold the head assembly stationary and turn the jack screw handle to position as desired. Do not force the jack screw handle, this can allow the screw to come loose from the stand.
5. Place stands to properly support the pipe. Generally pipe should be supported in at least two places. The number and placement of stands depend on the specific circumstances, including pipe size, length and weight.
6. Carefully place the pipe on the stands. Make sure that the pipe is properly centered on the stands to reduce the risk of tipping. Do not drop the pipe onto the stands. Do not exceed the stand ratings. Make sure pipe is stable and secure. Always stay clear of supported loads.
1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. Free technical support and operation Video during lifetime
5. The continuous supply of the spare parts.
6. After you got our products, test them, If you have any questions with them, contact with us, we will offer a solve way accordingly.
Q1. Payment
A: Generally, we do T/T 100% in advance or T/T 30% as deposit, and 70% before shippment. We can also accept other terms according to the clients and order amount.
Q2. Terms of delivery
A: EXW, FOB, CFR, CIF.
Q3. Delivery time
A: 10-30 days after receiving your advance payment. The exact delivery time depends on the items and the quantity of your order.
Q4. Package
A: Generally, we pack our goods in Carton and in pallet if required.
Q5. OEM
A: If you can provide your samples or technical drawings. We can open the mold and produce accordingly
Q6. Quality test
A: we test 10% bulk before delivery
Q7. HS CODE OF test pump
A: 8413190000